Define the Replacement Scope
A field-only project differs from replacing the tank and treatment equipment. Have the designer identify what can remain.
Review the Existing Tank
A field-only project and full-system replacement have different scopes.
Protect Usable Space
Reserve suitable soil and access before adding pools, paving or buildings.
Obtain the Design
Confirm sewer availability, soil findings and the health department’s approved layout.
Keep Final Records
Arrange inspection before cover-up and retain approval and maintenance requirements.